Updated
Updated · Livescience.com · Oct 17
Meta Unveils 4,300-Mile Petal Cable With 1-Petabit Capacity by 2029
Updated
Updated · Livescience.com · Oct 17

Meta Unveils 4,300-Mile Petal Cable With 1-Petabit Capacity by 2029

3 articles · Updated · Livescience.com · Oct 17

Summary

  • 1 million Gbps is the target speed for Meta's new Petal subsea cable, a 4,300-mile link between the U.S. and France due to enter service in 2029.
  • That would make Petal the first transoceanic cable to reach 1 petabit per second—about double existing cables of similar length and more than five times Meta's 192-Tbps Marea system.
  • 24 pairs of dual-core fibers and fan-in/fan-out signal routing are central to the design, letting 96 total cores carry the equivalent of 48 conventional fiber pairs without a proportional rise in power.
  • NEC will design and build the system, Sumitomo Electric will supply the fiber, and Meta said a cable of this length typically needs about 100 repeaters to keep optical signals strong.
  • Subsea cables carry about 99% of global internet traffic, making Petal part of Meta's broader push to expand backbone infrastructure after Marea in 2018, Amitie in 2023 and Anjana in 2025.

Insights

Could rapid advancements in satellite internet render Meta's massive petabit undersea cable obsolete before it even activates in 2029?
With Meta controlling the physical internet backbone, what hidden power does this grant them over global AI and data flows by 2029?
How does doubling transatlantic data capacity without extra power fundamentally change the future of international cloud computing and AI workloads?